Details

  • Suprafața lotului (ari):
    27200/2720000 m2

Overview

BUSINESS PLAN


1. Executive Summary

“Ungheni Logistic Hub” is a strategic project aimed at developing an integrated logistics and industrial complex, located on a total area of 272 hectares in Ungheni, at the border with Romania and the European Union.

The project leverages its unique geographic position along the international corridor connecting Iași – Ungheni – ChișinăuOdesa, as well as direct access to dual railway infrastructure (European and CIS gauge).

Total estimated investment:

👉 €504 million

Estimated annual revenue:

👉 Minimum €5 million (initial phase) + additional energy income

Projected market capitalization:

👉 €1.256 billion


2. Strategic Locație

📍 Locație: Ungheni, Republic of Moldova
📍 Direct border access to Romania (EU)

Key advantages:

  • Fast access to Iași (EU market)
  • Strong connection to Chișinău
  • Logistics corridor to Odesa
  • Railway hub “BEREȘTI” (dual gauge: EU + CIS)
  • International road infrastructure access

3. Project Description

Total land area: 272 ha


Component 1 – Logistics & Industrial Park

  • Area: 132 ha
  • Facilities:
    • Class A warehouses
    • Industrial / production spaces
  • Total built area: 1,000,000 m²

💰 Investment: €450 million

📈 Revenue streams:

  • Minimum €5 million/year (rent & logistics services)
  • OR sale of units at €1,000 – €1,300/m²

Component 2 – Renewable Energy Park

  • Area: 140 ha
  • Capacity:
    • Solar + wind: 120 MW
  • Annual production:
    • 140,000 MWh/year

💰 Investment: €54 million

📈 Revenue:

  • Electricity price: ~ 2.5 MDL/kWh
  • Annual revenue potential:
    👉 ~ 350 million MDL/year (~€17–18 million)
  • Optional:
    • Sale of capacity: €800,000 – €1,000,000 per MW

4. Competitive Advantages

✔ Strategic EU-border location
✔ Free economic / industrial zone potential
✔ Existing infrastructure (former military base)
✔ Dual railway system (EU + CIS)
✔ Lower operational costs vs EU markets
✔ Partial energy independence
✔ Strong scalability potential


5. Business Model

“Ungheni Logistic Hub” operates as an integrated logistics–industrial–energy ecosystem, generating multiple revenue streams:

A. Logistics & Industrial

  • Lease of Class A warehouses (€ / m² / month)
  • Lease of industrial production spaces
  • Sale of units (€1,000 – €1,300 / m²)
  • Logistics services:
    • Cross-docking
    • Long-term storage
    • Regional distribution
  • Railway terminal operations (handling & transit fees)

B. Renewable Energy

  • Electricity sales (PPA / spot market)
  • Direct supply contracts with industrial tenants
  • Sale of installed capacity (MW)
  • Additional opportunities:
    • Green certificates
    • Energy export to EU (Romania)

C. Additional Revenue Streams

  • Land lease for investors (build-to-suit projects)
  • Auxiliary services:
    • Truck parking (TIR hub)
    • Maintenance & facility management
    • Fuel storage / terminal
  • Strategic partnerships (joint ventures)

6. ROI (Return on Investment)

Total investment:

👉 €504 million


Estimated annual revenue:

ComponentRevenue
Logistics & industrial€5 – €15 million
Asset sales (optional)€100 – €300 million (one-off)
Renewable energy€17 – €18 million
Total recurring revenue€22 – €33 million/year

ROI Scenarios

🔹 Conservative scenario:

  • Annual revenue: ~€22 million
  • ROI: 18–22 years

🔹 Optimized scenario (with asset sales):

  • Faster capital recovery
  • ROI: 5–8 years

🔹 Strategic investor / exit scenario:

  • Project valuation: ~€1.256 billion
  • Potential profit:
    👉 €700+ million

7. Key Investment Indicators

  • IRR: 12% – 25%+
  • Target occupancy rate: 70% – 90%
  • Estimated rent:
    • €4 – €7 / m² (logistics)
  • Logistics yield:
    • 8% – 12%

8. Development Strategy

Phase 1 (0–24 months)

  • Infrastructure development
  • Initial warehouses
  • Launch of solar park
  • Anchor tenants acquisition

Phase 2 (2–5 years)

  • Industrial expansion
  • Railway terminal development
  • Energy contracts

Phase 3 (5+ years)

  • Full-scale operation
  • Exit / listing / institutional investment

9. Target Clients / Tenants

  • International logistics companies
  • Large retail chains (regional hubs)
  • Industrial manufacturers
  • EU–CIS distributors
  • E-commerce companies

10. Economic Impact

  • Job creation: 1000+ positions
  • Accelerated regional development
  • Increased import/export flows
  • Positioning Moldova as a regional logistics hub

11. Implementation Timeline

Phase 1 (0–18 months)

  • Infrastructure
  • Initial warehouses
  • Solar park launch

Phase 2 (18–36 months)

  • Logistics expansion
  • Industrial development

Phase 3 (36–60 months)

  • Full capacity
  • Full energy integration

12. Investment Conclusion

“Ungheni Logistic Hub” has the potential to become:

👉 The largest logistics and energy hub in Central and Eastern Europe

The project combines:

  • Strategic logistics
  • Industrial production
  • Green energy

➡️ Delivering a sustainable, scalable, and highly profitable investment model

Page Views

Be the first to review ““Ungheni Logistic Hub””

Rating